More Fermentation Tanks Are Ready To Go
Our customer’s brewery equipment has been completed and is waiting for delivery. All welding is done under heavy protection gear. Inside ground, outside ground and cooling jackets welded. We hold CE, PED and AS1210 certifications for fermentation tank and can meet nearly any government requirements in different countries.
Dished Top Head
- One CIP Spray Ball, 1.5″ Tri-Calmp Connection
- One Pressure Vacuum Relief Valve, 2″ Tri-Clamp Connection
- One Hops Adding Hole, 4″ Tri-Calmp Connection
Sidewall:
- One Shadowless Manway
- One Temperature Sensor, Tri-clamp Connection
- One Teflon Level Gauge, Tri-Clamp Connection
- One Sample Valve, Tri-Clamp Connection
- One Pressure Gauge & Pressure Regulation Valve assembly on the side CIP arms, Tri-Clamp Connection
- Cooling Jacketed
Cone Bottom Head
- One Drain Discharge
- 75mm PU Insulation
- Mounted on Four Cylindrical Legs
Interested in learning more about Brewing Systems including additional details and pricing information? Please use the form below to contact us!